{"id":22219,"date":"2024-01-06T09:28:56","date_gmt":"2024-01-06T08:28:56","guid":{"rendered":"https:\/\/www.haslinger-nagele.com\/elwg-check-kein-netzanschluss-unter-dieser-nummer\/"},"modified":"2025-09-24T10:17:15","modified_gmt":"2025-09-24T08:17:15","slug":"elwg-check-kein-netzanschluss-unter-dieser-nummer","status":"publish","type":"post","link":"https:\/\/www.haslinger-nagele.com\/en\/elwg-check-kein-netzanschluss-unter-dieser-nummer\/","title":{"rendered":"ElWG Check: (no) (network) connection under this number?"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">What has happened so far<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The energy transition<\/strong> is facing a <strong>dilemma<\/strong>: renewables are booming, and the expansion of <strong>photovoltaics<\/strong> in particular is advancing rapidly. However, the connection of these generation plants to the power grid often fails due to insufficient grid capacities. As a result, the electricity generated can be used for <strong>self-consumption<\/strong>, but any <strong>surplus<\/strong> cannot find a buyer \u2013 even though there would be interested parties, including in the neighborhood (energy communities). The <strong>expansion of power grids<\/strong> is also progressing rapidly, but it can hardly keep pace with the expansion of renewables.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The current ElWG draft attempts to provide a remedy here:<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">New definitions<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">It is striking that the new law no longer distinguishes between <strong>network access<\/strong> and <strong>network connection<\/strong>. This is to be welcomed, as this distinction has often led to <strong>misunderstandings<\/strong>. In addition, the <strong>network connection point<\/strong> (transfer point), which was already regulated in the market rules or in the General Distribution Network Conditions, is now legally defined. This is the contractually specified interface that connects the user\u2019s system with a transmission or distribution grid.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">Network connection point (transfer point) = the contractually specified interface that connects the user\u2019s system with a transmission or distribution grid.<\/p>\n\n\n\n<p class=\"has-small-font-size wp-block-paragraph\">&nbsp;Definition of network connection point in the draft ElWG<\/p>\n<\/blockquote>\n\n\n\n<h2 class=\"wp-block-heading\">General connection obligation<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The <strong>general connection obligation<\/strong>, according to which distribution network operators are required to conclude private-law contracts on grid connection with end consumers and producers, remains in place. It is being expanded and extended to <strong>operators of energy storage facilities<\/strong> and (downstream) network operators. In addition<strong>, the general terms and conditions<\/strong> underlying the contracts between customers and network operators will no longer be drawn up by the distribution network operator, but by the regulatory authority (E-Control).<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Network connection fee \u2013 new<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">There are also changes to the grid fee, which is no longer called <strong>network access fee<\/strong>, but network connection fee (combining the network access fee and the network provision fee). This is due to the fact that it is now up to the regulatory authority to set the fee, with the legislator only making a proposal, although the amount of the fee will remain unchanged for the time being.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is also clarified that the network connection fee, in the event of an increase in the grid-effective capacity, is <strong>only charged to the extent of the increase<\/strong>. Finally, the fee privilege that previously applied to small PV systems (&lt; 20 kW) is now extended to all small renewable energy systems.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Flexible grid access<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">As before, network connection must be distinguished from <strong>network access<\/strong>, which refers to the <strong>use of the network<\/strong>. Unchanged, the network operator can refuse network access due to insufficient grid capacity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">New is that the network operator must examine the possibility of <strong>flexible network access<\/strong> if the grid access requested by the entitled party cannot be granted to the desired extent or during the desired period. This is intended to facilitate the connection of generation plants, even if not all of the producible electricity can be fed into the grid from the start.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p class=\"wp-block-paragraph\">In the case of a new or modified grid access for a feed-in grid user, it can be contractually stipulated that the network operator specifies the maximum grid-effective capacity either statically or dynamically, if \u2026<br><em><br><\/em><\/p>\n\n\n\n<p class=\"has-small-font-size wp-block-paragraph\">&#8220;Flexible grid access&#8221; in the draft ElWG<\/p>\n<\/blockquote>\n\n\n\n<p class=\"wp-block-paragraph\">This is to be welcomed, as it strengthens the <strong>incentive<\/strong> to expand renewable energy. The specified grid-effective capacity for <strong>photovoltaic<\/strong> and <strong>wind power plants<\/strong> connected at grid levels 4 to 7 must not fall below 80% or 90% of the maximum capacity, respectively.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Conclusion<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">When it comes to network connection and network access, it is particularly clear that legislators are seeking to strike a <strong>balance<\/strong> between the interests of grid customers (consumers, producers) and the interests of grid operators. What stands out here is the possibility now provided for granting customers <strong>flexible grid access<\/strong>. At first glance, this seems to be a sensible approach to reduce the previous connection problems caused by insufficient grid capacities (&#8220;all or nothing&#8221;). It remains to be seen whether and how this option will be accepted in practice and whether the parliamentary process will bring about any changes in this regard.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Disclaimer<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This article is for general information only and does not replace legal advice. Haslinger \/ Nagele Rechtsanw\u00e4lte GmbH assumes no liability for the content and correctness of this article.<\/p>\n\n\n\t\t\t\t\t\t\t\t\t<div class=\"cards-thumbs-round align-full\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"container\">\n\n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"row\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"col-12 col-lg-6\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"intro\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t      <h2 class=\"light\">Further information on this legal field can be found here<\/h2>\n\t\t\t\t\t\t\t\t\t\t\t\t    \n\t\t\t\t\t\t\t\t\t\t\t\t    \n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"col-12 col-lg-6\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"image\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"row\">\n\n\t\t\t\t\t\t\t\t\t\t    \n\t\t\t\t\t\t\t\t\t\t\t   \t\n\t\t\t\t\t\t\t\t\t\t   \t\t<div class=\"col-12 col-lg-4\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"item h-100\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"image\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t  \t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t  <img decoding=\"async\" src=\"https:\/\/www.haslinger-nagele.com\/wp-content\/uploads\/2025\/07\/Wind-Netze-Kombi_quadr1080_mit-3.png\" alt=\"Illustration 360\u00b0 Erneuerbare Energie\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"text\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<h3>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t    \t\t\t\t\t\t\t\t\t\t\t\t\t\t        <a href=\"https:\/\/www.haslinger-nagele.com\/en\/b\/360-renewable-energy\/\" \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t          target=\"_blank\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t          360\u00b0 Renewable Energy\t\t\t\t\t\t\t\t\t\t\t\t\t\t        <\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t    \t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/h3>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t\t\t\t\t    \n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t\t\t\t<div class=\"cards-thumbs-round align-full\">\n\t\t\t\t\t\t\t\t\t\t<div class=\"container\">\n\n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t<div class=\"row\">\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"col-12 col-lg-6\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"intro\">\n\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t      <h2 class=\"light\">Authors<\/h2>\n\t\t\t\t\t\t\t\t\t\t\t\t    \n\t\t\t\t\t\t\t\t\t\t\t\t    \n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"col-12 col-lg-6\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"image\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"row\">\n\n\t\t\t\t\t\t\t\t\t\t    \n\t\t\t\t\t\t\t\t\t\t\t   \t\n\t\t\t\t\t\t\t\t\t\t   \t\t<div class=\"col-12 col-lg-4\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"item h-100\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"image\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"text\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<h3>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t    \t\t\t\t\t\t\t\t\t\t\t\t\t\t        <a href=\"https:\/\/www.haslinger-nagele.com\/en\/team\/johannes-hartlieb\/\" \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t          target=\"_blank\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t          Johannes Hartlieb\t\t\t\t\t\t\t\t\t\t\t\t\t\t        <\/a>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t    \t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/h3>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t      Attorney-at-Law\t\t\t\t\t\t\t\t\t\t\t\t\t\t    \n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t\t\t\t\t    \n\t\t\t\t\t\t\t\t\t\t\t   \t\n\t\t\t\t\t\t\t\t\t\t   \t\t<div class=\"col-12 col-lg-4\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"item h-100\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"image\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"text\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<h3>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t    \t\t\t\t\t\t\t\t\t\t\t\t\t\t\t      Kaleb Kitzm\u00fcller\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t    \t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/h3>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\n\t\t\t\t\t\t\t\t\t\t    \n\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\n\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>The current draft of the ElWG attempts to remedy this situation. <\/p>\n","protected":false},"author":18,"featured_media":20126,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_lmt_disableupdate":"","_lmt_disable":"","footnotes":""},"categories":[163,152],"class_list":["post-22219","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-360-renewable-energy","category-environmental-technology"],"acf":[],"modified_by":"Empfang","_links":{"self":[{"href":"https:\/\/www.haslinger-nagele.com\/en\/wp-json\/wp\/v2\/posts\/22219","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.haslinger-nagele.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.haslinger-nagele.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.haslinger-nagele.com\/en\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.haslinger-nagele.com\/en\/wp-json\/wp\/v2\/comments?post=22219"}],"version-history":[{"count":0,"href":"https:\/\/www.haslinger-nagele.com\/en\/wp-json\/wp\/v2\/posts\/22219\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.haslinger-nagele.com\/en\/wp-json\/wp\/v2\/media\/20126"}],"wp:attachment":[{"href":"https:\/\/www.haslinger-nagele.com\/en\/wp-json\/wp\/v2\/media?parent=22219"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.haslinger-nagele.com\/en\/wp-json\/wp\/v2\/categories?post=22219"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}